摘要
在茨坪水电站应用FZ-3弹性瓦来取代水轮发电机推力轴承的钨金瓦。FZ-3弹性瓦的运行可靠性和经济效益均优于钨金瓦。
In Ciping Hydropower Station,the FZ-3 elasto-plastic thrust shoe is applied to replace the old wolfram steel thrust shoe.The operating reliability and economic benefit of the hydro-generating set are improved.
出处
《水电与新能源》
2010年第5期59-60,共2页
Hydropower and New Energy