摘要
新疆钢铁公司炼钢厂继1997年3月16日实现了二炼钢系统全连铸生产后,于1997年9月份又开始了连铸高效化的攻关。本文就该厂连铸高效化攻关中遇到的问题进行了分析,并提出了解决办法。
After the realization of full continuous casting on Marchl6, 1997, the high - efficiency productive practice in continuous casting has been studied with emphasis since September 1997 in the NO. 2 steelworks system of Xing Jing Iron and Steel Group Co. The existent problems and solving measures in the process are described and analysed in detail.
出处
《连铸》
1999年第3期15-17,31,共4页
Continuous Casting