摘要 根据全国主要电网1990~1998年发电量、发电装机容量增长数据及实际运行情况,阐明了1998年全国各电网电力供需平衡情况及富裕度,并对1999~2002年各电网电力供需平衡作了分析预测。预测表明,在不计新开工项目投产的情况下,大多数电网供需基本平衡,少数电网将缺电;大多数电网无结转建设规模,少数电网结转很少,都不能满足用电增长的需要。因此建议在近期按“十五”期间用电增长及技改需要逐年安排一些新开工项目,以保证国民经济持续、快速、健康发展用电的需要。 On the basis of the increases in the power generation and installed capacity of the main power grids from 1990 to 1998, and in accordance with the actual operation, this paper illustrates the demand/supply balance of all the power grids and their adequacy in 1998. The article also analyzes and anticipates the demand/supply balance of all the power grids from 1999 to 2002. It is shown if the newly launched projects are not considered, demand and supply of the most of the power grids will be balanced, and only a few power grids will be lack of electricity. There were no unfulfilled construction plans in most of the power grids the capacity is too small for a few power grids, which could not satisfy the requirement of the consumption increase. So in the short run, based on the increases in power consumption and technical upgrading requirements in the 'Tenth Five year plan' period, it is necessary to launch some new projects annually so as to assure the power demand for the national economic development in a sustainable, fast and heathy manner.
机构地区 国家开发银行
出处 《电网技术》 EI CSCD 北大核心 1999年第6期1-4,共4页 Power System Technology
关键词 电力供需分析 电网 电力需求 电力工业 中国 main power grids power supply power demand
  • 相关文献

同被引文献16

  • 1徐志.永州南部电网需求侧管理与电力预警分析[J].湖南电力,2004,24(4):57-58. 被引量:1
  • 2陈小龙,谢诞梅,杨长柱,刘占辉,武云鹏.目前电力供需失衡现象的原因及对策分析[J].华中电力,2006,19(3):12-15. 被引量:1
  • 3胡兆光,李英,李琼慧,韩新阳,单葆国.电力供需实验室的开发与建设[J].电力技术经济,2007,19(1):42-47. 被引量:9
  • 4衣斌.浅谈电力供需紧张矛盾的原因及措施[J].科技信息,2007(12):218-218. 被引量:1
  • 5Pindyck, R. S., Rotemberg, J. J. Dynanic factor demands and the effects of energy price shocks [J]. American Economic Review, 1983, (73)y 1066-1079.
  • 6Webb I. R., Larson R.C.Period and phase of customer replenishment: a new approach to the strategic inventory/routing problem [J]. European Journal ofOperational Research, 1995, (85),P132-148.
  • 7Hamilton, J. D. A neoclassical model of unemployment and the business cycle[J]. Journal of Political Economy, 1988, (96)3a 593-617.
  • 8Wang Siqiang,Methodology of Energy Forecasting and Early Warning[M]. Beijing:Tsinghua University Press,2010,P4-9(Ch).
  • 9彭小平.中长期电力负荷预测及预警系统的分析与设计.北京:华北电力大学,2007.
  • 10胡兆光.电力供需模拟实验室[M].北京:中国电力出版社,2009:2-26.