摘要
针对南河埭大桥的施工实际,对施工荷载—模板支架—软基系统进行了跟踪分析计算与实验研究,实现了该桥的施工监控,保证了大桥的顺利建成。
The structure system with construction load mould plate support soft subgrade of Nanhedai Bridge being under construction is timely analyzed by means of computational method and test. The adjustment for mould altitude is made on the basis of the analysis results.
出处
《中国公路学报》
EI
CAS
CSCD
北大核心
1999年第2期72-77,共6页
China Journal of Highway and Transport
关键词
软土地基
连续梁桥
施工
监控
模拟计算
soft soil subgrade
continuous beam bridge
field test
simulation analysis
test and research