华蓥山隧道新奥法施工中的位移量测分析 被引量:6

Displacement Measurement Analysis of Huayingshan Tunnel during Excavation with NATM
下载PDF
导出
摘要 通过对华蓥山隧道Ⅲ、Ⅳ、Ⅴ类洞身围岩的位移历时变化特性的分析,提出了不同围岩类别的隧道施工中二次衬砌的合理施作时间和破坏域范围,并将量测位移值与边界元计算结果进行对比,发现二者送变规律具有较好的一致性。 The relationship of surrounding rock displacement with time during excavation of Huayingshan Tunnel with NATM was given an emphatic analysis . As an analytical results of III, IV ,V class rock deformation with time , a reasonable time for permanent support and plastic zones around tunnel after excavation was put forward . After the obtained displacement was compared with calculated results by boundary element program , a simple displacement regularity was reached .
作者 刘洪洲
出处 《世界隧道》 1999年第3期28-30,35,共4页
关键词 公路隧道 新奥法 位移量测 施工 Road Tunnel Displacement Measurement NATM Permanent Support BEM
  • 相关文献

参考文献4

  • 1高山昭.新奥法的施工[J].隧道译丛,1983,(7).
  • 2Tanim.,C 佘诗刚.超应力岩石隧道工程中变形与支护压力的关系[J].隧道译丛,1990(1):58-61. 被引量:1
  • 3刘洪州.新奥法建造隧道中围岩变形过程及其规律性研究.重庆大学硕士论文[M].,1993..
  • 4刘洪州.公路隧道施工中的管棚技术与塌方防治.第四届中国国际岩土钻凿工程会议论文集[M].,..

同被引文献67

引证文献6

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部