摘要
采用“桩箱(筏)基础共同作用”程序对工程实测进行探讨和分析,桩箱(筏)基础的桩数优化应用该程序是可行的.
In this paper, using the program of interacting of piled box and raft foundation analyzed and explored real examples of engineering, It was flexible that pile number's optimization of the pile, box and raft foundation used the program.
关键词
桩数优化方法
共同作用
桩箱基础
桩筏基础
source program
pile number's optimization method
pile, box and raft foundation