摘要 中国面板堆石坝的实践经验认为,主次堆石分界线位置倾向下游,有利于高面板堆石坝的变形控制。美国的Palmi提出了主次堆石分界线的位置倾向上游,并适当降低次堆石区的顶部高程,次堆石区顶部位置向下游方向移动的分区理念。为此通过有限元仿真计算,对比两种分区形式对高面板堆石坝应力变形性状的影响。结果表明,这种新型分区理念有利于减小面板的脱空和结构应力,在理论上是是可行的,值得在实践中推广。 The specialists in China believe that the separation line of main and hypo-rockfill zone inclining to downstream is beneficial to the deformation control of high CFRD, while Palmi suggests a new concept for subzoning, in which the separation line inclines to upstream, the height of hypo-rockfill zone is reduced and the top position of the hypo-rockfill zone moves to the downstream. The effects of two subzoning methods on the stress and deformation of CFRD are studied by FEM and the results show that the new concept is beneficial to reduce the slab void and structural stress and is feasible in theory.
出处 《水力发电》 北大核心 2010年第10期24-27,共4页 Water Power
基金 中国水利水电科学研究院开放基金资助项目
关键词 高面板堆石坝 分区 应力变形 可行性 high concrete face roekfill dam subzoning stress and deformation feasibility
  • 相关文献

参考文献8

  • 1徐泽平,邓刚.高面板堆石坝的技术进展及超高面板堆石坝关键技术问题探讨[J].水利学报,2008,39(10):1226-1234. 被引量:50
  • 2Borges J M V, Teixeira K L, Foes P A, Manhaes P. Design and c onstruction of the Barra grande hydro plant [J]. Hydropowerand Dams, 2004(2): 27-28.
  • 3Johannesson P, Sixtus L T. Lessons Learned from the Cracking of Mohale CFRD Slab [ A]. Proceedings of Workshop on High Dam Knowhow[C ]. Yichang, 2007: 237-257.
  • 4Johannesson P. Modified Zoning and Compaction Requirements for Future High CFRDs[A]. Proceedings of Workshop on High Dam Knowhow[C ]. Yichang, 2007: 237-257.
  • 5钱家欢,殷宗泽.土工原理与计算[M].北京:中国水利电力出版社,1993.
  • 6陈慧远.土石坝有限元分析[M].南京:河海大学出版社,1987.
  • 7岑威钧,朱岳明,罗平平.面板堆石坝有限元仿真计算及参数敏感性研究[J].水利水电科技进展,2005,25(4):16-18. 被引量:21
  • 8王新敏.ANSYS丁程结构数值分析[M].北京:人民交通出版社.2007.

二级参考文献13

  • 1Duncan J M,Strength, stress-strain and bulk modulus parameters for finite element analysis of stresses and movements in soil masses[ M ] , Berkeley : University of California, 1980.1- 101 .
  • 2B.马铁龙.世界高混凝土面板堆石坝的发展[A].中国混凝土面板堆石坝20年[C].北京:中国水利水电出版社,2005.19-27.
  • 3Materon B. State of Art of Compacted Concrete Face Rockfill Dams[ A]. Proceedings; of Workshop on High Dam Knowhow[ C] . Yichang, 2007.11 - 17.
  • 4Hydropower and Dams. Updates on Some Major CFRD Projects[J]. Hydropower and Dams, 2004, (3) : 109 - 113.
  • 5Hydropower and Dams. Progress at Current Major CFRD Projects[J] . Hydropower and Dams, 2003, (4): 79- 87.
  • 6Borges J M V, Teixeira K L, Foes P A, Manhaes P. Design and construction of the barra grande hydro plant [ J ]. Hydoopower and Dams, 2004,(2) : 27- 28.
  • 7Palmi Johannesson, Sixtus L T. Lessons Learned from the Cracking of Mohale CFRD Slab [A]. Proceedings of Workshop on High Dam Know-how[C] . Yichang, 2007. 237- 257.
  • 8Palmi Johannesson. Modified Zoning and Compaction Requirements for Future High CFRDs[ A] . Proceedings of Workshop on High Dam Know - how[ C]. Yichang, 2007.237 - 257.
  • 9Palmi Johannesson. Slab Performance on a FEW CFRDs and Suggested Improvements in Slab Design-Synopsis version [ A]. Proceedings of Workshop on High Dam Know-how[ C ]. Yichang, 2007. 287 - 300.
  • 10Cruz Paulo T, Freitas Jr, Manoel S. Cracks and Flows in Concrete Face Rock Fill Dams (CFRD)[A]. Proceedings of Symposium on Dam Engineering[ C]. Lisbon, Portugal, 2007.1 - 14.

共引文献85

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部