期刊文献+

福建省“九五”地震监测台网台站震级校正及单台震级应用研究 被引量:5

Studies on Single Station’s Magnitude Biases Correction in Fujian "nine-five" Earthquake Network and Its Applications
下载PDF
导出
摘要 首先介绍了福建省地震监测台网的建设和发展情况,在总结震级计算方法的基础上,分析了福建省"九五"地震监测台网中29个台站的平均震级偏差对台网震级确定造成的影响,并以此为依据对台网内单台测定震级进行校正。然后分网内和网外两种情况,分别回归得到了由单台(首台)震级确定最终震级的关系,并对单台震级测定所需时间进行了统计。结果表明,对平均台间距60 km的网内地震,一般在单台P波到达后的10 s内即可由单台震级估计出最终震级。 This paper briefly introduces the construction and development of Fujian earthquake monitoring network. Based on original earthquake magnitude calculation methods, the paper analyzes the magnitude biases of the 29 stations in the "nine-five" network and its influence on the final network's magnitude result. Based on this, the paprer calibrates the single station's magnitude result. Then the paper regresses the relationship between single station's magnitude result and final network's magnitude result for inner and outer cases respectively, and records the time needed for the single station's magnitude calculation. The result showed that using the magnitude calculation method presented in this paper, it cost about 10 minutes to estimate the magnitude for earthquakes in the network.
出处 《华南地震》 2010年第3期27-36,共10页 South China Journal of Seismology
基金 国家科技支撑计划2009BAK55B03
关键词 单台(首台)震级 最终震级 需时 Single (first station) magnitude Final magnitude Time cost
  • 相关文献

参考文献12

  • 1Cooper.Letter to editor.San Francisco Daily Evening Bulletin,1968-11-03.
  • 2Nakamura Y.On the urgent earthquake detection and alarm system(UrEDAS)[R].Tokyo:Proc.9th of World conference on Earthquake Engineering,1988.
  • 3Allen R M,H Kanamori.The potential for earthquake early warning in Southem California[J].Science,2003,300:786-789.
  • 4Odaka T,K Ashiya,S Tsukada,et al.A new method of quickly estimating epicentral distance and magnitude for a single seismic record[J].Bull Scism Soc Am,2003,93:526-532.
  • 5Tsukada S,Odaka T.A new method of estimating epieentral distance and magnitude for early detection(2)[J].Application of JMA data,2003,93(1):526-532.
  • 6Yih-Min Wu,Richard M.Allen,Chien-Fu Wu.Revised ML determination for crustal earthquakes in Taiwan[J].Bull Seism Soc Am,2005,95(5):2517-2524.
  • 7Ta-liang Teng,Ludan Wu,Tzay-Chyn Shin,et al.One minute after:strong-motion map,effective epicenter,and effective magnimde[J].Bull Seism Soc Am,1997,87(5):1209-1219.
  • 8Yih-Min Wu,Tzay-Chyn Shin,Yi-Ben Tsai.Quick and reliable determination of magnimde for seismic early warning[J].Bull Seism Soc Am,1998,88(5):1254-1259.
  • 9Kanamori H.Real-time seismology and earthquake damage mitigation[J].Annual Review of Earth and Planetary science,2005,33:195-214.
  • 10黄媛,杨建思.用于地震预警系统中的快速地震定位方法综述[J].国际地震动态,2006,27(12):1-5. 被引量:14

二级参考文献20

共引文献35

同被引文献43

引证文献5

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部