摘要
对工程项目在监理过程中的决策阶段、设计阶段、招投标阶段、施工阶段、竣工验收阶段的投资控制进行了论述、明确了工程监理过程中各阶段投资控制的方法和意义,以期实现投资目标,并保证效益最大化。
This paper discusses the investment control of the engineering project at the management decision-making phase, design phase, bidding phase, construction phase, and completion acceptance stage in the process of supervision, explicates the methods and meaning of invest- ment control at every phase in the process of engineering supervision, in order to achieve investment objectives and to ensure maximum benefit
出处
《山西建筑》
2010年第29期239-240,共2页
Shanxi Architecture
关键词
投资控制
决策
设计
招投标
竣工验收
investment control, decision-making, design, tendering, acceptance check for completed construction projects