摘要
对原执行的冷轧薄钢带SPCE的退火工艺进行了工艺优化,缩短了保温时间,成功解决了SPCE材料抗拉强度不合格的问题,提高了性能合格率。
The original implementation of the cold-rolled thin steel SPCE the annealing process were optimized to shorten the holding time, Successfully solved the issue of unqualified SPCE material tensile strength, and increased performance pass rate.
出处
《重钢技术》
2010年第3期12-15,共4页
CISC Technology
关键词
SPCE
抗拉强度
退火
优化
SPCE tensile strength annealing optimize