摘要
为分析铁路生产力布局的调整对货物运到期限的影响,通过调研、借鉴有关文献,分析了铁路生产力布局的调整对货物送达时间的影响,统计分析了各类货运产品的日均运行时间和平均旅速,并对统计结果进行了检验。以此为依据,对现行运到期限计算方法进行了改进,并根据统计分析结果和有关文献,确定了各参数的取值范围。
In order to analyze the effects of adjusting of railway productivity distributing on time limit of freight transport, on the basis of investigating and literature, railway freight forwarding process and every tache of forwarding process were analyzed, and the reasonable point of penetration for calculating time limit of freight transport was confirmed. Further more, the effects of adjusting of railway productivity distributing on time limit of freight transport were analyzed. According to result of surveying and analyzing, category of railway freight transport was compartmentalized on the basis of parameter of the traffic kilometrage of a train traveling in one day. Finally, the dynamical adjustment to various parameteres in the improved computational method for the time limit of the freight was proposed.
出处
《铁道科学与工程学报》
CAS
CSCD
2010年第4期111-115,共5页
Journal of Railway Science and Engineering
基金
教育部"春晖计划"(Z2005-1-62008)
甘肃省自然科学基金资助项目(ZS022-A25-036)
关键词
铁路
生产力布局
运到期限
送达时间
railway
productivity distributing
time limit of freight transport