摘要
就2001年华东电网状况、电网结构对可能出现的运行方式的适应性和合理性、主干网络承受大干扰的能力、电网运行中存在的主要问题及其对策等方面作了分析研究。
The condition of the power grid for ECPN′s planning by 2001 is described.The study is centered on the adaptability and reasonability of the structure of the power grid under various possible operating modes,as well as the stability of the main power grid in case of large disturbance.The main problems existed in the power operation and their countermeasures are also provided.
出处
《华东电力》
1999年第3期1-4,共4页
East China Electric Power