摘要
阐述了发电厂电磁干扰的根源、电磁兼容性抗扰试验方法以及验收准则,并对DCS的抗扰预防措施进行了探讨和实践。
The reason that EMI is engendered in the electric power plant, methods and the acceptance criteria of EMC testing have been elaborated in this paper. Meanwhile, immunity measures for DCS have been discussed and put into practice.
出处
《浙江电力》
1999年第2期1-5,15,共6页
Zhejiang Electric Power