期刊文献+

建筑废弃物产出水平影响因素分析 被引量:3

Analysis on Influence Factors of Construction Waste Generation Level
下载PDF
导出
摘要 本文用建筑材料转变为废弃物的比例(废料率)反映施工活动的建筑废弃物产出水平,通过实地调查和问卷调查获得了5种建筑材料的废料率。通过对废料率分析发现,建筑用途、材料类型、施工企业资质和管理水平对建筑废弃物产出水平有明显影响,而建筑面积对建筑废弃物产出水平没有显著影响,结构形式对建筑废弃物产出水平的影响不能确定。 The waste rates of five main materials, which indicate the generation level of construction waste, were collected by site visit and questionnaire survey. The building occupancy, material type, quantification class and management level of construction companies are the crucial factors that influence the generation level of construction waste, while gross floor area is a trivial factor. The effect of building structure cannot been obtained due to the limited samples.
出处 《华中科技大学学报(城市科学版)》 CAS 2010年第3期39-42,共4页 Journal of Huazhong University of Science and Technology
基金 住房和城乡建设部软科学研究项目(2010-6-27) 住房和城乡建设部软科学研究项目(2009-K4-17)
关键词 建筑废弃物 废料率 影响因素 调查 construction waste waste rate of material influencing factor investigation
  • 相关文献

参考文献8

  • 1李平.综合利用建筑垃圾 大力发展循环经济[J].特区实践与理论,2007(6):84-87. 被引量:12
  • 2Bossink B A G,Brouwers H J H.Construction waste:quantification and source evaluation[J].Journal of Construction Engineering and Management,1996,122(1):55-60.
  • 3Formoso C T,Soibelman L,Cesare C D,et al.Material waste in building industry:main causes and prevention[J].Journal of Construction Engineering and Management,2002,128(4):316-325.
  • 4Forsythe P,Marsden P K.Modeling Construction Waste Performance-an Arising Procurement Issue[C]// Ogunlana S O,ed.,Profitable partnering in construction procurement,CIB W92 (Procurement Systems) and CIB TG23 (Culture in Construction) Joint Symposium,London:1999:679-688.
  • 5Poon C S,Yu A T W,Jaillon L.Reducing building waste at construction sites in Hong Kong[J].Construction Management and Economic,2004,(22):675-689.
  • 6Tam V W Y,Shen L Y,Tam C M.Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations[J].Building and Environment,2007,(42):1471-1477.
  • 7吴贤国,李惠强,杜婷.建筑施工废料的数量、组成与产生原因分析[J].华中理工大学学报,2000,28(12):96-97. 被引量:37
  • 8深圳市建设工程造价管理站.2006深圳市建设工程技术经济指标[R].深圳:深圳市建设工程造价管理站,2006.

二级参考文献1

共引文献45

同被引文献39

  • 1朱家元,杨云,张恒喜,王卓健.基于优化最小二乘支持向量机的小样本预测研究[J].航空学报,2004,25(6):565-568. 被引量:61
  • 2陆凯安.我国建筑垃圾的现状与综合利用[J].建材工业信息,2005(6):15-16. 被引量:25
  • 3黄荣尧 李崇德.建筑废弃物回收系统制度之研究.台湾科技大学技术学刊,2005,20(1):91-106.
  • 4王罗春,赵由才.建筑废弃物处理与资源化[M].北京:化学工业出版社,2004.
  • 5D. Fatta, A. Papadopoulos, E. Avramikos, et al. Generation and management of construction and demolition waste in Greece-an existing challenge [ J ]. Resources, Conservation and Recycling, 2003,40( 1 ) :81-91.
  • 6C. Llatas. A model for quantifying construction waste in projects according to the European waste list [ J ]. Waste Management, 2011,31 (6) :1261-1276.
  • 7Aluisio Braz De Melo, Arlindo F Goncalves, Isabel M Martins. Construction and demolition waste generation and management in Lisbon (Portugal) [J]. Resources, Conservation and Recycling, 2011, 55(12) :1252-1264.
  • 8Tulay Esin, Nilay Cosgun. A study conducted to reduce construction waste generation in Turkey [ J ]. Building and Environment, 2007,42 ( 4 ) : 1667-1674.
  • 9K M Cochran, T G Townsend. Estimating construction and demolition debris generation using a materials flow analysis approach [ J]. Waste Management, 2010, 30( 11 ) :2247-2254.
  • 10Weisheng Lu, Hongping Yuan, Jingru Li, et al. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China [ J ]. Waste Management, 2011, 31 (4) :680-687.

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部