期刊文献+

岸边集装箱装卸桥前伸臂双拉杆拉点的优化设计

Optimal Design about the Tension Point of Double Tension Bar of Front Arm on Shore Container Crane
下载PDF
导出
摘要 在岸边集装箱装卸桥上,采用双拉杆支撑的前伸臂是一种超静定结构。对于这种超静定结构,通过合理地选择双拉杆拉点的位置,可以使得前伸臂上由拉点所分隔的各段中的最大应力值相接近,这样,前伸臂上的各段就能充分发挥其自身的作用。由此所获得的各段截面尺寸也应该是较为合理的。基于这一指导思想,本文提出了以追求前伸臂上各段中的最大应力值尽可能相接近为目标的优化设计方法。 On the container crane,the boom supported by double tension bars is a redundance structure.Choosing reasonablely the locations of the tension points,for the boom,the max stress values in the boom′s several parts which are separated by the tension points can be equal approximalely.So,each several parts of the boom could be made the best use of and the several cross sections of the boom should be reasonable.Based on above view,this paper introduces a optimum design method.The target of the method enables the max stress values in the several parts of the boom to be equal as possible as it can.
出处 《港口装卸》 北大核心 1999年第2期3-5,共3页 Port Operation
关键词 前伸臂 拉点 优化设计 集装箱船 装卸桥 Boom Tension Point Optimum design
  • 相关文献

参考文献1

  • 1陈玮璋.起重运输机金属结构[M].北京:人民交通出版社,1988..

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部