摘要
对二滩水电站推木船的箱形推木架结构,开式、单泵。
A log pushing ship for Ertan hydro electric power station has been designed.This article discusses some problems about log pushing box of frame structure,constitude of bleed off and open type hydraulic system with single pump.It also probes into the balance valve's debugging
出处
《武汉交通科技大学学报》
1999年第2期135-138,共4页
Journal of Wuhan University of Technology(Transportation Science & Engineering)
关键词
液控单向阀
平衡阀
推木船
液压推木架
log pushing frame
hydraulic station
one way hydraulical valve
balance valve