该文针对上海轨道交通10号线盾构施工穿越虹桥机场跑道工程,采用数值方法对上海软土地层盾构穿越机场跑道施工控制技术进行模拟,并和现场实测数据结果进行比较和分析。提出进一步减小地层扰动影响措施,成功地应用于盾构穿越机场跑道施工,取得了良好的效果。
As for the project of Shanghai Rail Traffic No.10 Line to cross the runway of Hongqiao Airport by the shield construction,the article uses the numerical value method to simulate the construction control technology of the shield to cross the airport runway in the soft soil stratum of Shanghai,and compares and analyzes the field measured data.The article puts forward the measures further to decrease the disturbing influence on the stratum,which are successfully used in the construction of the shield crossing the airport runway with the good effect.