工程建设项目临时用地定额指标初探——以高速铁路制梁场为例 被引量:7

Preliminary Study on Quota Indices Selection and Quantification for Controlling the Temporary Construction Land Use:A Case Study on Beam Fabricating Yards of High-speed Railway
下载PDF
导出
摘要 研究目的:分析目前工程建设项目临时用地管理中存在的问题,探讨工程建设项目临时用地定额确定方法。研究方法:对比分析法,统计数据分析法,Delphi法。研究结果:分析得出高速铁路制梁场基础用地定额及其修正方法。研究结论:在相关工程设计技术规范要求的基础上,综合考虑区域自然条件、工程施工条件、施工进度安排等因素,确定高速铁路临时用地基础定额及其修正方法,为规范临时用地管理提供参考。 The purposes of the paper are to analyze the existing problems on governing temporary land use for construction projects, and to explore the quota indices selection and quantification methods for controlling the temporary land uses. Methods employed include comparative analysis, statistical data analysis and Delphi method. The results indicate that through analysis the methods for selecting indices and quantifying the basic quotas that controls the land use of beam fabricating yard of high-speed railway have been obtained. It is concluded that based on the requirements of engineering techniques and specifications, the basic quota of temporary land use for constructing the high-speed railway and its modification method can be determined with the comprehensive consideration of regional natural conditions, project construction conditions and construction progress arrangement, which can also provide reference point for the standardized governance of other temporary land uses.
出处 《中国土地科学》 CSSCI 北大核心 2010年第9期57-63,共7页 China Land Science
基金 国家科技支撑计划"中部粮食主产区增量经济型土地整理技术开发"(2008BAB38B06)
关键词 土地利用 高速铁路 制梁场 用地定额 指标修正 land use high-speed railway beam fabricating yard quota of land use index modification
  • 相关文献

参考文献14

二级参考文献38

共引文献152

同被引文献142

引证文献7

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部