摘要
涪陵五中后山滑坡为一顺层岩石滑坡,滑坡滑动堵塞了319国道,严重影响到涪陵等地的对外交通,社会影响巨大。设计采用上部清方,下部设置抗滑桩、锚索框架等支挡工程进行综合治理,取得了很好效果。其成功经验对于城区滑坡的治理,尤其是大型顺层岩石滑坡的治理很有借鉴意义。
Fuling No.5 Middle School back mountain landslide is of consequent rock landslide,which blocks 319 national highway,seriously influencing transportation to and from Fuling with huge social influence.Comprehensive treatment measures haven been taken such as clearing earthwork in upper part and setting anti-slide pile and anchor cable frame in lower part,achieving good effect.Its successful experience can be reference for urban landslide treatment,especially large-scale consequent rock landslide.
出处
《路基工程》
2010年第5期192-194,共3页
Subgrade Engineering
关键词
涪陵
顺层岩石滑坡
成因分析
工程治理
Fuling
consequent rock landslide
cause analysis
engineering treatment