跑马坪电站厂区边坡加固处理研究

Research on Reinforced Measures for Side Slope in Plant Area of Paomaping Hydropower Station
下载PDF
导出
摘要 跑马坪电站厂区开挖边坡最大高度112 m,边坡开挖后存在滑动面可能性,其安全影响到整个电站的运行和安全。依据边坡地质条件,通过反演分析,提出计算参数,进行不同工况计算,根据计算结果,分析研究了不同工况的边坡稳定性,提出加固处理方案,保证了边坡的安全,对以后同类边坡的设计和研究有一定的借鉴作用。 The maximum height of the excavated side slope in the plant area of Paomaping Hydropower Station reaches 112 m,therefore,there exists the possibility of landslide,which will threaten the operation and safety of the hydropower station.In the paper,the inverse analysis is made to get the calculation parameters in the light of geological conditions.Then,according to the parameters obtained,the stability of the side slope is analyzed and studied in various working conditions,and the reinforced scheme is proposed based on the calculation results,which would not only guarantee the slope safey,but also provide references for the design and research of high slopes.
作者 赵玮 毛拥政
出处 《水利与建筑工程学报》 2010年第5期66-69,共4页 Journal of Water Resources and Architectural Engineering
关键词 高边坡 反演分析 计算参数 加固 high slope inverse analysis calculation parameter reinforcement
  • 相关文献

参考文献5

二级参考文献19

共引文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部