摘要
以三门峡南站候车大厅网架工程为背景,根据工程特点和现场实际情况,采用了网架整体顶升法进行施工,就其安装工艺流程、安装要点进行了详细阐述,对类似工程施工具有一定指导意义。
Taking the grid project of the waiting hall of south station of Sanmenxia as the background, the paper according to the engineering feature and the site status, adopts the general jacking method of grid and illustrates the installation craft process and the installation points, so as to have the direction for similar project.
出处
《山西建筑》
2010年第30期145-146,共2页
Shanxi Architecture
关键词
网架
安装
焊接
施工
grid, installation, welding, construction