摘要
针对轨道交通线路长,跨越不同的周围环境,岩土工程勘察外业条件复杂的特点,以上海轨道交通11号线南段详勘Ⅰ标段的实施为例,对轨道交通岩土工程勘察组织实施中的几个问题进行分析探讨,以期为类似工程实施提供指导。
Based on features of long traffic routes, crossing different surroundings, and complex outdoor geotechnical engineering inspection condition, taking the implementation of south section I of Shanghai rail traffic line No. 11 as an example, it discusses several problems in organization and implementation of rail traffic geoteehnical engineering investigation, with a view to provide guidance for similar projects.
出处
《山西建筑》
2010年第30期287-289,共3页
Shanxi Architecture
关键词
轨道交通
岩土工程勘察
组织实施
rail traffic, geotechnical engineering investigation, organization and implementation