简单分析了桥头跳车的特点和危害,研究了强夯法对桥头跳车的处理作用、施工工序以及质量控制等方面的具体要求,指出采用强夯法治理桥头跳车病害工期短、费用低、效果明显、工艺简单,值得推广。
This article briefly analyzes characteristics and hazards of bump at bridge-head, studies specific requirements of dynamic consolidation method for bump at bridge-head, such as processing function, construction processes and quality control. Then, it points out advantages of bump at bridge-head hazard treatment with dynamic consolidation method, such as short duration, low cost, obvious effect, and simple process. Therefore, it is worth promoting.
出处
《山西建筑》
2010年第30期303-304,共2页
Shanxi Architecture
关键词
地基处理
桥头跳车
施工工序
质量控制
foundation treatment, vehicle bump at bridge-head, construction processes, quality control