摘要
针对天津港南疆港区28号--29号泊位前期疏浚工程中存在的施工条件困难、干扰大、泥面标高差较大等难题,详细介绍了围埝工程的主要施工工艺和质量控制措施,对同类工程项目具有一定指导意义。
Aiming at the difficulties in the primary dredging project of No. 28--No. 29 berthes of Nanjiang port of Tianjin port, including the difficulty of construction condition, the huge interruption and big elevation differences of ash, the paper mainly introduces the main construction craft and the quality control measures for the reclamation dam projects, so it will be meaningful to direct similar projects.
出处
《山西建筑》
2010年第30期366-367,共2页
Shanxi Architecture
关键词
围埝工程
充灌袋
塑料排水板
模袋
reclamation dam project, bags, plastic drainage sheet, model bag