期刊文献+

CTCS-3级列控系统无线通信网络综合监测技术的研究 被引量:5

Study of Synthetic Monitoring Technical Used in Wireless Communication System for CTCS-3 Train Control System
下载PDF
导出
摘要 针对我国铁路的CTCS-3级列控系统的特点,提出了CTCS-3级列控系统无线通信网络综合监测技术,对车-地数据传输的几个关键接口——Abis接口(BSC与BTS)、A接口(MSC与TRAU)和PRI接口(MSC与列控RBC)上列控呼叫的信令流程、数据传输过程以及线路状态等进行完整的监测和记录,并采用综合分析和联合诊断技术、多层协议分析与解码技术、多用户实时跟踪与查询技术等关键技术,为列控数据传输分析、故障定位和分析、通信网络优化与维护以及干扰分析等方面提供技术依据。 This article discussed comprehensive network monitoring technical used in CTCS-3 wireless communication system based on the characteristic of CTCS-3,which enables monitoring over several key interfaces,including the Abis interface between BSC and BTS,the A interface between MSC and TRAU,and the PRI interface between MSC and RBC and can made integral recordings of the whole procedure of signaling and data transmission of train operation control calls as well as track conditions.With comprehensive analysis and joint diagnosis technology,multi-layer protocol analysis and decoding technology,multi-user real time tracing and inquiry technology,and etc.,this monitoring system can provide technical data for CTCS-3 data transmission analysis,fault location and analysis,optimization and maintenance of communication network,and interference analysis.
出处 《铁道通信信号》 2010年第10期5-8,共4页 Railway Signalling & Communication
关键词 铁路综合数字移动通信系统 监测系统 CTCS-3级列控系统 GSM-R Monitoring system CTCS-3 level train control system
  • 相关文献

参考文献2

  • 1科技运[2008]168号.CTCS-3级列控系统GSM-R网络需求规范[S].中华人民共和国铁道部,2008.
  • 204E1171-ETCS/GSM-R Quality of Service-Operational Analysis.

同被引文献33

  • 1张锐.国内外铁路信号现状、差距对比和我国铁路信号发展方向的思考[J].铁道标准设计,2004,24(7):117-120. 被引量:8
  • 2黎江,刘正自,石先明.新干线信号通信设备的维修管理体制[J].铁道通信信号,2005,41(10):45-47. 被引量:3
  • 3TAKASHIGE T. Development history of train control system technology[J]. Railway & Electrical Engineering, 2004, 15(2): 1-7.
  • 4TAKASHIGE T. Signalling systems for safe railway transport [ J]. Japan Railway & Transport Review, 1999(21) : 44-50.
  • 5McHUTCHON M A, STASZEWSKI W J, SCHMID F. Signal processing for remote condition monitoring of railway points[J]. Strain, 2005, 41(2) : 71-85.
  • 6DENIAU V, DUDOYER S, HEDDEBAUT M, et al. Test bench for the evaluation of GSM-R operation in the presence of electric arc interference [ C ] ///Electrical Systems for Aircraft, Railway and Ship Propulsion (ESARS). Bologna: IEEE, 2012: 1-6.
  • 7DUDOYER S, DENIAU V, ADRIANO R R, et al. Study of the susceptibility of the GSM-R communications face to the electromagnetic interferences of the rail environment [ J]. IEEE Transactions on Electromagnetic Compatibility, 2012, 54 (3) : 667-676.
  • 8OUKHELLOU L, DEBIOLLES A, DECEUX T, et al. Fault diagnosis in railway track circuits using Dempster-Shafer classifier fusion[ J]. Engineering Applications of Artificial Intelligence, 2009, 23 ( 1 ) : 117-128 .
  • 9铁道部科学技术司,铁道部运输局.CTCS-3级列控系统系统需求规范(SRS)第一册[S].2008,9.
  • 10蒋文怡,钟章队.动车组列控设备动态监测系统[J].铁道通信信号,2007(增刊):65-67.

引证文献5

二级引证文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部