期刊文献+

基于遗传算法的集成生产计划排程系统 被引量:3

Integrated System of Production Planning and Scheduling Based on Genetic Algorithm
下载PDF
导出
摘要 分布式多工厂生产计划是制造全球化带来的新问题。快速及时供货是敏捷制造的基本特点。本文将就分布式多工厂生产计划中的一种典型问题展开讨论,包括各种交货期下的多工厂计划的、问题的、初步的数学模型和并基于遗传算法对模型进行仿真和优化。 Distributed multi-plant production planning is a new problem which is brought by globalization. Quick and timely delivery is the basic characteristics of agile manufacturing. This paper will plant distributed in more than a typical discussion of issues, including delivery of multiplant under the plan, problem, and preliminary mathematical model and the model based on genetic algorithm simulation and optimization .
作者 周昕 凌兴宏
出处 《科技信息》 2010年第09X期36-37,共2页 Science & Technology Information
关键词 生产计划与调度 遗传算法 优化 Production planning and scheduling Genetic algorithm Optimization
  • 相关文献

参考文献6

  • 1Johnny C.Ho,Yih-Long Chang.An integrated MRP and JIT framework,computer & industrial engineering 41(2001):173-185.
  • 2Johnny C.Ho,Yih-long Chang.An integrated MRP and JIT framework,computer&industrial engineering 41(2001):173-185.
  • 3曹江辉,朱建江,王宁生.基于CORBA的企业信息系统研究[J].计算机工程与应用,2001,37(6):4-6. 被引量:9
  • 4林中伟,谢强,丁秋林,宁福臣.基于遗传算法的多级有限能力生产计划[J].小型微型计算机系统,2003,24(1):123-126. 被引量:5
  • 5[日]玄光男 陈润伟.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 6王小平 曹立明.遗传算法理论、应用与软件实现[M].西安:西安交通大学出版社,2003..

二级参考文献9

  • 1[1]Ren Shoujun. Modern manufacturing system analysis and design [M]. Beijing: Science Press, 1999
  • 2[2]Wang, D W. Earliness/tardiness production planning approaches for manufacturing systems [J]. Computers &Ind. Eng, 1995,28:425~436
  • 3[3]Wang, D W. , Fang, S C. A semi-infinite programming model for earliness/tardiness production planning with a genetic algorithm [J]. Computers Mathematics with Applications, 1996,31: 31~36
  • 4[4]Wang Wei, Wang D W. Single part JIT production scheduling of manufacturing enterprise based on fuzzy delivery time limit [J].Journal of System Engineering, 1998,2: 63~69
  • 5[5]Tang Li-xin. Theory and application of production batch scheduling under CIMS [M]. Beijing :Science Press, 1999,2
  • 6[6]Xuan Guangman, Cheng Run-wei. Genetic algorithm and engineering design[M]. Beijing: Science Press, 2000,1
  • 7[7]Liu Yong, Kan Li-san,Chen Liu-ping. Non-Numerical current algorithm[M]. Beijing: Science Press, 1995,1
  • 8周之英,现代软件工程,2000年
  • 9王玮,汪定伟,王晓琦.基于模糊交货期的单件制造业准时化生产计划[J].系统工程学报,1998,13(2):63-69. 被引量:10

共引文献76

同被引文献20

  • 1王成双,丁勇.基于遗传算法的生产调度研究[J].长春理工大学学报(高教版),2009(8):65-66. 被引量:2
  • 2Jun Ma, Jianxin Liao, Xiaomin Zhu, Chun Wang, Yuting Zhang. Mobile terminal capability management for services enabling. In: IEEE International Conference on Wireless and Mobile Communications 2006 (1CWMC2006), Session ICWMC18, ISBN 0-7695-2629-2, Bucharest, Romania, 2006.
  • 3Ramamoorthy C V,Chandy K M,Gonzalez Mario J. Optimal scheduling strategies in a multi-processor system. IEEE Trans Comput, 1972,C-21 (2): 137-146.
  • 4CHEN F, PREZENER Z, RYAN J K, et al. Qualitifying the bullwhip effect in a simple supply chain:the impact of forecasting, lead times and information [J]. Management Science, 2000,46 (3) : 436-443.
  • 5MICHEAL G H,WALLACE J H. Due date setting with supply constrains in systems using MRP[J]. Computers & In- dustrial Engineering, 2001,39 (3) : 293-305.
  • 6徐建平 罗妤.面向大规模定制的生产计划研究.现代管理技术,2010,.
  • 7Granes S.C. A review of production scheduling[J].Operations Research,1981,(04):646-675.
  • 8唐家驹.刘书庆质量管理学[M]北京:中国计量出版社,2008.
  • 9马永.基于遗传算法求解排课问题的研究[J].福建电脑,2008,24(6):110-111. 被引量:3
  • 10王洪锋,李洪宇.生产计划和车间排程问题的整数规划解法[J].现代制造工程,2008(7):92-95. 被引量:6

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部