期刊文献+

昆明新机场航站楼超长混凝土结构施工技术 被引量:1

Construction Technology of Super-long Concrete Structure in Kunming New Airport Terminal
下载PDF
导出
摘要 针对昆明新机场航站楼超长混凝土结构,采取设置后浇带、采用补偿收缩混凝土技术、掺加聚丙烯短纤维、合理设置诱导缝及施加预应力等多方面措施,以解决超长混凝土结构裂缝难题。同时介绍了施工过程中,对混凝土强度、配制、浇筑和养护的要求,并对无黏结预应力筋的设计和施工要点进行总结,最后对整个施工过程进行检验,符合国家相关规范,取得良好效果。 For the super-long concrete structure in Kunming New Airport Terminal,authors applied lots of measures to solve the problem of concrete cracks,such as setting late poured bands and induced joints,using the concrete technology of shrinkage-compensating,adding polypropylene short fiber and appling prestress.In the process of construction,authors introduced the requirements on concrete strength,preparation,pouring and maintenance.At the same time,they summarized the design and construction of unbonded prestressed steel-bars.At last,the whole construction process is tested.The above measures have a good effect and accorde with related codes.
出处 《施工技术》 CAS 北大核心 2010年第10期1-4,共4页 Construction Technology
基金 中国建筑工程总公司科研项目(CSCEC-2009-Z-28)
关键词 昆明新机场 超长混凝土结构 裂缝 无黏结预应力 Kunming New Airport super-long concrete structure cracks unbonded prestress
  • 相关文献

参考文献3

  • 1中国建筑科学研究院.GB50010-2002混凝土结构设计规范[S].北京:中国建筑工业出版社,2002.
  • 2LinTY BurnsNH.预应力混凝土结构设计[M].北京:中国铁道出版社,1983..
  • 3CCES01-2004混凝土结构耐久性设计与施工指南(2005年版)[S].北京:中国建筑工业出版社,2005,.

共引文献92

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部