摘要 某特大桥引桥的一部分采用三跨一联现浇预应力混凝土箱梁结构,在桥面沥青混凝土铺装层施工结束后,在极端温度(40℃)作用下,发现某几个桥梁墩柱出现了横向或斜向裂缝。在对开裂桥墩及桥面进行详细的现场勘查后,针对裂缝的成因进行了模拟计算和分析,预测了已有裂缝对未来成桥运营的影响,同时也为施工单位提出了裂缝处理建议。 The cast-in-situ prestressed concrete box girder was adopted in part of approach bridge of one super large bridge.After finished the construction of asphalt concrete pavement of bridge deck and with the influence of the extreme high temperature(40℃),several transverse or oblique cracks were found on some piers.After investigated crack of pier and bridge deck in detail,simulation calculation and analysis were executed aiming at analyzing crack causes and forecasting the influence of exited cracks,meanwhile,treatment suggestion about the crack was put forward for construction unit.
出处 《施工技术》 CAS 北大核心 2010年第10期67-70,共4页 Construction Technology
关键词 桥墩 裂缝 温度 伸缩缝 pier crack temperature expansion joint
  • 相关文献

参考文献5

  • 1刘其伟,朱俊,唐蓓华,蔡永胜.沥青高温摊铺时钢筋混凝土箱梁的温度分布试验[J].中国公路学报,2007,20(4):96-100. 被引量:16
  • 2中交公路规划设计研究院有限公司.JTGD62-2004公路钢筋混凝土及预应力混凝土桥涵设计规范[S].北京:人民交通出版社,2004.
  • 3中交公路规划设计研究院有限公司.JTGD60-2004公路桥涵设计通用规范[S].北京:人民交通出版社,2004.
  • 4M. Osama Jannadi, Bassam M. Tahir. A concrete pier: case history of failure and repair [ J ]. Construction and Building Materials, 2000,14 ( 2 ) :7-16.
  • 5范立础.桥梁工程[M].北京:人民交通出版社,2003..

二级参考文献17

共引文献49

同被引文献34

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部