摘要
国贸三期工程主塔楼采用钢骨混凝土组合结构,其体量大、结构形式复杂、施工难度大,质量要求高。针对工程施工难点,介绍了超高层钢骨混凝土组合结构的施工工艺,节点深化设计阶段以及施工阶段应解决的有关关键技术问题,同时简述实施过程中的几个控制要点。
China World Trade Center Tower Ⅲ Project is a steel-concrete composite structure,which has huge volume,complicated structure,difficult construction and high quality requirement.According to the construction difficulties,the construction technologies of complicated steel concrete composite structure are introduced.The key technical problems to be solved in the detailing design stage and construction stage,as well as key-points for construction control are summarized.
出处
《施工技术》
CAS
北大核心
2010年第10期89-92,共4页
Construction Technology
关键词
钢骨混凝土组合结构
超高层
深化设计
steel-concrete composite structure
super-tall building
detailed design