青岛李村河污水处理厂二期工程的设计与运行 被引量:8

Design and Operation of Second-phase Project of Qingdao Licunhe WWTP
原文传递
导出
摘要 青岛李村河污水处理厂二期工程采用多模式A2/O工艺,可实现VIP、多点进水倒置A2/O、A2/O、预缺氧+A2/O四种工艺方式,详细介绍了处理工艺特点、设计运行参数、自控升级改造方式、调试措施、运行特点。实际运行结果表明,该工艺具有较强的耐冲击负荷能力,适应不同环境条件下的运行需求,各项出水指标均达到了设计要求。 Multimode A^2/O process is used in second-phase project of Qingdao Licunhe WWTP. The process can be adjusted to VIP, inverted A2/O with step feed, A2/O and preanoxic + A2/O operat- ing modes. The technological features, design and operating parameters, automation control system up- grading, commissioning measures and operation features are introduced. The operation practice shows that the muhimode process has good resistance to shock loading and higher adaptability to the different conditions. The effluent quality reaches the design standard.
出处 《中国给水排水》 CAS CSCD 北大核心 2010年第20期76-80,共5页 China Water & Wastewater
关键词 多模式A^2/O工艺 除磷 脱氮 污泥上清液 muhimode A2/O process phosphorus removal nitrogen removal sludge supernatant
  • 相关文献

参考文献2

  • 1陆嘉弘.M-UCT法用于市政污水的除磷脱氮[A].全国污水处理除磷脱氮技术研讨会论文集[C].上海:中国木工程学会水工业分会排水专业委员会,2000.
  • 2尹士君,李亚峰.水处理构筑物设计与计算[M].北京:化学工业出版社,2003.

共引文献2

同被引文献41

引证文献8

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部