4Michel R. Innovative in live line maintenance for high voltage substation ( ≥ 63 kV) at EDF ( Electricit6 de France) [C]. IEEE 6th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance, Las Vegas, Nevada, USA, 1993.
5Alexandru S,Oltean M,Fagarasan T,et al. Live replace- ment of 400 kV busbar insulators in Brasov Substation [C]. IEEE 12th International Conference on Transmis- sion and Distribution Construction, Operation and Live- Line Maintenance, Rhode Island, USA, 2011.
6Florea G A, Oltean M, Rodean I. , Live-line procedures to be applied for the painting of the 400/220 kV iron gates(Romania) structures painting[C]. IEEE 12th In- ternational Conference on Transmission and Distribu- tion Construction, Operation and Live-Line Malnte- nance, Rhode Island, USA , 2011.
7Belak L,Marusa R,Ferlic R,et al. Strategic maintenance of 400 kV switching substations[J]. IEEE Transactions on Power Delivery, 2013,28(1) : 394-401.