2KENZO K, NOBUYUKI N. Efficient Monte Carlo sim- ulation method of GERT - type network for project management [ J ]. Computers & Industrial Engineering, 2002,42(2 -4) :521 -531.
3LUIS F A, DAVID B A, ANGELIQUE S H, et al. Risk planning and management for the panama canal expansion program [ J ]. Journal of Construction Engi- neering and Management ,2011,137 (10) : 111 - 113.
4BADU A J G, SURESH N. Project management with time, cost and quality considerations[J]. European Jour- nal of Operational Research, 1996,88 (2) :320 - 327.
5EI - RAYES K, KANDIL A. Time - cost - quality trade- off analysis for highway construction[ J]. Jour- nal of Construction Engineering and Management, 2005, 131 (4):477-478.
6HSIEH C H. Optimzation of fuzzy production inventorymodels [ J ]. Information Sciences ,2002,146 ( 1 ) :29 - 40.
7MORTEZA B. Designing a control mechanism using earned value analysis:an application to production en- vironment[J]. The International Journal of Advanced Manufacturing Technology,2010 (49) : 419 -429.