期刊文献+

低渗透气田水平井钻井(完井)液技术 被引量:5

HORIZONTAL WELL DRILLING AND COMPLETION FLUIDS TECHNOLOGY IN LOW PERMEABILITY GAS FIELD
下载PDF
导出
摘要 针对低渗透气田平井钻井过程中的井壁稳定、钻头泥包、及保护储层技术难题,室内研发了用于斜井段的双钾盐聚合物钻井液体系和用于长水平段配合裸眼完井工艺特点的无粘土低伤害暂堵钻井(完井)液体系,并在长北气田20余口分支水平井成功应用。结果表明,斜井段易塌层平均井径扩大率低于20%,244mm技术套管均安全顺利下达窗口,这种尺寸套管及其下深在长庆油田尚属首次。水平段安全顺利钻过2245m水平段分支,裸眼完井并直接气举投产,获得无阻流量超过200×104m3/D的单井高产,创造了长庆气田新纪录,保护储层效果明显。 In order to solve such technical challenges in horizontal well drilling of low permeability gas field as borehole wall sta bility,bit balling and reservoir protection,double potassium polymer drilling fluid has been developed which is mainly used in the deviated intervals,and clay free low damage temporary plugging drilling and completion fluids have been developed as well which are used in long horizontal intervals and open hole completion wells.It has heen successfully used in more than 20 multilateral horizontal wells in Changbei gas field.The results indicated that the average hole enlargement rate is lower than 20% in deviated internal of easy collapse formation,244mm technical casing can be safely and successfully run down and set on the pre-aet position,which is the first time for such size casing to run in such depth in Changqing oil field.The horizontal interval has been sucessfully drilled through 2245m horizontal lateral,with open hole completion and gas lift production,each well with open-flow capacity of more than 200 104m3/d,which sets a new record in Changqing gas field,with significant effect in reservoir protection.
出处 《钻采工艺》 CAS 北大核心 2010年第B06期15-21,7,共7页 Drilling & Production Technology
关键词 低渗透气田 钻井液 井壁稳定 钻头泥包 储层保护 low permeability gas field,drilling fluid,borehole wall stability,bit balling,reservoir protection
  • 相关文献

参考文献7

二级参考文献31

  • 1蒋官澄,鄢捷年,吴学诗.水平井储层损害的室内评价方法[J].石油大学学报(自然科学版),1993,17(4):28-34. 被引量:12
  • 2胡东晖,鄢捷年.水平井产能的影响因素[J].石油勘探与开发,1994,21(5):44-52. 被引量:40
  • 3宗瑞国,鄢捷年,蒋官澄.官H—1水平井钻井液完井液设计与应用[J].钻井液与完井液,1994,11(5):33-39. 被引量:2
  • 4Warren M T. Stim-hole rotary steerable system brosdens applications[J]. World Oil, 1997,(Sept):83-97.
  • 5Murray P. Barriers to slim hole drilling[J]. World Oil, 1994,215(3):58-61.
  • 6van Oort E, Bland R G, Howard S K, et al. Improving HPHT stability of water based drilling flulds[Z]. SPE 37 605,1997.
  • 7Bland R G, Smith G L, Eagark P, et al. Low salinity polyglycol waterbased drilling fluids as altematives to oil-based muds[Z]. SPE 36 400,1996.
  • 8Dick M A,Heinz T J, Svoboda C F, et al. Optimizing the selection of bridging particles for reservoir drilling fluids[Z]. SPE 58 793,2000.
  • 9Thaemlitz C, Patel A, Coffin G, et al. A new environmentally safe high-temperature, water-based drilling fluid system[Z]. SPE 37 606,1997.
  • 10Holt Jr, Charles A, Falmy H. The successful application of diesd as horizontal drilling fluid[Z]. SPE 39 283,1997.

共引文献99

同被引文献25

引证文献5

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部