较详细地介绍了昆山南站中心站房结构设计的步骤,包括结构选型、结构分析、节点设计、基础设计等。该结构采用双向倒三角钢管桁架,应用通用结构分析与设计软件SAP2000V(12.0.1)进行结构计算分析。
The structural design step of the south railway station of Kunshan is introduced,which includes structural system selection,design of the tubular joint,design of the pile foundation and so on.The triangle CHSS truss is used in the structure.A structural analysis is conducted on the whole building using a program of Sap2000(v12.0.1).
出处
《华中建筑》
2010年第10期29-30,共2页
Huazhong Architecture
关键词
空间管桁架
结构选型
相贯节点
小立柱
桩基
Special hollow structural section truss
Structural system selection
Tubular joint
Little column
Pile foundation