期刊文献+

赵东油田极浅海平台的海上安装 被引量:7

Offshore Installation of Extremely Shallow Water Platform in Zhaodong Oilfield
下载PDF
导出
摘要 海上固定平台上部组块常规的安装方法有浮吊吊装安装和驳船调载浮托安装两种方法,这两种安装技术都比较成熟。但赵东油田海上钻井平台(ODB平台)上部组块重约39640kN,而国内最大的浮吊"蓝疆"号的最大吊装能力为38000kN,所以浮吊吊装法不可用。并且由于平台位于渤海湾滩海区域,平均海图水深仅2.4m,水深极浅,调载难度极大,无法采用驳船调载浮托安装法。鉴于此,经过综合考虑,平台组块的海上安装采用了海上拉索千斤顶提升结合浮托的安装方法、插腿式结构设计等特殊技术,同时充分利用潮汐的变化,最终成功安装。文章介绍了拉索千斤顶提升结合浮托的安装过程及该方法的优缺点。 Typical offshore installation of fixed platform topside includes two types of fully-fledged methods: lifting installation and floatover installation with barge ballast.The topside weight of the drilling platform ODB in Zhaodong Oilfield is about 39 640 kN,but Lanjiang,the biggest derrick barge in China,has only the lifting capacity of 38 000 kN,accordingly lifting method is not suitable for ODB topside installation.Moreover,the platform is located in extremely shallow water area in Bohai Bay and the mean water depth is only 2.4 m at the platform site.The water depth is so shallow that floatover installation with ballast can’t be used.Therefore,floatover installation method with strand jack uplift is adopted,meanwhile the inserted leg type structure and favourable flood tide time are also utilized.Finally ODB topside is successfully installed.The installation course using floatover method with strand jack uplift is described,and the advantages and disadvantages as well.
作者 包清华
出处 《石油工程建设》 2010年第5期29-31,共3页 Petroleum Engineering Construction
关键词 海上钻井平台 安装 极浅海 拉索千斤顶 提升式浮托安装 offshore drilling platform installation extreme shallow water strand jack floatover installation with uplift
  • 相关文献

同被引文献44

  • 1秦海岩.我国海上风电发展回顾与展望[J].海洋经济,2022,12(2):50-58. 被引量:7
  • 2陆丛红,林焰,纪卓尚,蔡尊德,王敏,贾芳民.超大型海洋结构物海上安全运输绑扎件设计[J].海洋工程,2004,22(4):102-106. 被引量:6
  • 3杨桦,杨敏.荷载传递法研究单桩荷载-沉降关系进展综述[J].地下空间与工程学报,2006,2(1):155-159. 被引量:25
  • 4房晓明,郝军,魏行超.南堡35-2油田中心平台应用浮托法安装新工艺实践[J].中国海上油气(工程),2006,18(2):126-129. 被引量:23
  • 5Michel Seij, Henk de Groot. State of the art in float overs [C]. Offshore technology conference. OTC19702, Texas: Houston,2007.
  • 6O'Neil L A, Fakas E, Ronalds B F. History, Trend and evolution of float-over deck installation in open waters [C]. SPE Annual Technical Conference and Exhibition, SPE 63037, Texas: Dallas, 2000.
  • 7Alan M. Wang, Xizhao Jiang, Changsheng Yu. Latest Progress in Floatover Technologies for Offshore Installations and Decommis- sioning [C]. Proceedings of the 20th(2010) International Offshore and Polar Engineering Conference. Beijing: 2010.
  • 8Jong-Jin Jung, Woo-Seob Lee. Evaluating the impact load on the offshore platform during float-over topside installation [C]. Pro- ceedings of the 19th International Offshore and Polar Engineering Conference, Japan, Osaka: 2009, 205-210.
  • 9Gerner F W B, J van der Tempel, Delft U. of Tech. Motion com- pensated float-over installation with the use of ampelmann systems [ C ]. Offshore Technology Conference, OTC18640. Texas, Houston: 2007.
  • 10Xia J, Hayne S, Macfarlane G. Investigation into float-over instal- lations of minimal platforms by hydrodynamic model testing [C].Proceedings of 24th International Conference on Offshore Mechan- ics and Arctic Engineering, OMAE2005-67092, Greece, Halkidi- ki: 2005.

引证文献7

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部