惠州抽水蓄能电站控制性断层研究 被引量:2

Research on Control Fault of Huizhou Pumped Storage Power Station
下载PDF
导出
摘要 惠州抽水蓄能电站工程输水发电系统主要为地下建筑物,地下厂房洞室群及高压隧洞稳定性是工程关键。场区发育的f304断层是控制性断层,对输水发电系统的布置、安全关系重大。对f304断层的研究准确查明了断层的空间分布、性状,对优化输水发电系统地下厂房洞室群及高压隧洞位置,避开重大工程地质问题,显著改善建筑物工程地质条件,确保工程安全运行等方面起到关键性作用。 The water delivery system of Huizhou pumped storage power station is mainly underground structure.The stability of underground powerhouse caverns and high pressure tunnels is the key point of the project.The f304 fault developed in plant area is control fault,which is very important for the layout and safety of water delivery system.Through research on the f304 fault,this paper finds out the distribution and properties of the fault,thus to play an important role on optimizing the position of underground powerhouse caverns and high pressure tunnels of water delivery system,avoiding serious engineering geological problems,obviously improving the geologic condition of structures as well as ensuring safe operation of the project.
出处 《资源环境与工程》 2010年第5期461-465,共5页 Resources Environment & Engineering
关键词 惠州抽水蓄能电站 地下厂房洞室群 高压隧洞 控制性断层 优化布置 Huizhou pumped storage power station underground powerhouse caverns high pressure tunnels control fault optimized layout
  • 相关文献

参考文献3

  • 1陈国能,陈云长,王汇明,魏炳荣,吴国荣,等.广东惠州抽水蓄能电站f304断裂及其相关地质体研究[R].广州:中山大学地球科学系,广东省水利电力勘测设计研究院,2003.
  • 2谷兆祺,等.惠州抽水蓄能电站高压水道安全评估报告[R].北京:清华大学水利水电工程系,2009.
  • 3吴国荣.广东惠州抽水蓄能电站工程施工图设计阶段输水发电系统工程地质勘察报告[R].广州:广东省水利电力勘测设计研究院,2007.

共引文献1

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部