期刊文献+

土石坝施工期的孔隙水压力试验研究 被引量:1

Study on the Pore-water Pressure Test During Earth-rockfill Dam Construction
下载PDF
导出
摘要 土石坝施工期稳定计算时,需要计算孔隙水压力。对用于土石坝填筑的不透水土体需进行试验研究,以提供施工期的初始孔隙水压力μ0。经对三轴试验、孔隙水压力消散试验及压缩试验所计算得的孔隙水压力μ0参数进行比较,并结合孔隙水压力消散系数CV研究,提出土石坝施工期稳定计算所需的合理建议参数。 The pore-water pressure need to calculate when the stability of the earth-rock dam is calculated during construction.Based on test of the impermeable soil body used filling earth-rock fill dam,the initial pore-water pressure μ0 was obtained.In this paper,the parameters μ0 of the pore-water pressure calculated from the trail test,pore-water pressure dissipation test and compression test were contrasted.Combination with dissipation coefficient Cv of pore-water pressure,reasonable parameters of the stability calculation during the earth-rock dam construction were proposed.
作者 梁为邦
出处 《资源环境与工程》 2010年第5期505-507,共3页 Resources Environment & Engineering
关键词 孔隙水压力 试验 分析 对比 土石坝 pore-water pressure test analysis contrast earth-rockfill dam
  • 相关文献

参考文献1

  • 1碾压式土石坝设计手册[S].北京:能源部/水利部水利水电规划设计总院,1989.

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部