期刊文献+

南夹江裁湾工程地质问题分析

Analysis on Engineering Geological Problems of Cut-off in Nanjiajiang
下载PDF
导出
摘要 南夹江为长江铜陵河段的一条汊河,现河道为一"几"字形河道,阻水严重,岸坡多处发生崩塌。裁湾工程拟将原来的"几"字形河道裁湾取直,使河道顺直,减轻防洪压力。工程区分布有厚覆盖层,厚度60 m左右,岩性主要为粉质粘土、粉质壤土、砂壤土、细砂和砾石等,存在拦河坝端头抗冲刷、渗漏与渗透破坏、饱和砂土震动液化和地基沉降变形等工程地质问题。 Nanjiajiang as a distributary of Tongling-Yangtze River,is a "几" shape and with the problems of resisting water seriously,breaking avalanche disaster arround the bank.The cut-off project will modify the "几" shape river to make water move smoothly and relieve the pressure of preventing flood.This place distributes a 60 m thick cover layer.The lithology mainly contains silty clay,silty loam soil,sandy loam soil,fine sand,gravel and etc..Therefore,some geological problems,such as erosion,leakage and seepage destroy,liquefaction by shaking and foundation deformation exist in the project.
出处 《资源环境与工程》 2010年第5期593-596,共4页 Resources Environment & Engineering
关键词 南夹江 裁湾取直 地质问题 Nanjiajiang cut-off geological problems
  • 相关文献

参考文献2

  • 1长江勘测规划设计研究有限责任公司.长江铜陵河段南夹江综合治理工程可行性研究工程地质勘察报告[R].武汉:长江勘测规划设计研究有限责任公司,2010.
  • 2李茂华,陈又华,舒华波,王正波,黄华,孙青兰.南水北调中线引江济汉工程地质条件分析[J].人民长江,2007,38(9):38-39. 被引量:1

二级参考文献1

  • 1长江水利委员会综合勘测局.汉江中下游引江济汉工程初步研究工程地质勘察报告.武汉:长江水利委员会,2002.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部