结合"夹马口灌区节水改扩建工程——泉杜二级站"中预应力钢筒混凝土管道(PC-CP)敷设工程实践,探讨了PCCP管道敷设施工过程中的施工质量控制要点。
Combining with the engineering practice to lay PCCP of Quandu Pumping Station in water-saving and extension project of Jiamakou Irrigation District,the paper researches on the key points to control the construction quality of laying and installing PCCP.
出处
《山西水利科技》
2010年第4期31-32,共2页
Shanxi Hydrotechnics