摘要
针对万家寨引黄北干1号隧洞工程、张峰供水发电洞工程、张峰输水16号隧洞工程及坪上引水隧洞(段家庄~甲子湾)工程不同洞身衬砌混凝土施工方法进行比较分析,总结得出隧洞衬砌混凝土采用的最佳方法。
In the paper,the different construction method to build tunnel's concrete lining are compared and analyzed for NO.1 tunnel of North Main Line of Wanjiazhai YRDP,Zhangfeng Water sappy and power tunnel,Zhangfeng NO.16 tunnel and Pengshang water diversion tunnel,and at last the best methods for different tunnel lining are summarized.
出处
《山西水利科技》
2010年第4期35-37,共3页
Shanxi Hydrotechnics
关键词
隧洞
混凝土衬砌
施工方法
比较分析
tunnel
concrete lining
construction method
comparing and analyzing