期刊文献+

有源应答器监测集成的探索与思考 被引量:1

Exploration of Active Balise Monitoring System Integration
下载PDF
导出
摘要 有源应答器监测装置已经在既有线CTCS-2级列控区段车站应用,由于自身的不足,影响监测装置在新建铁路的进一步推广。有源应答器进行实时监测,对于消除安全隐患,确保行车安全十分必要,因此从系统集成角度出发,跳开现有将有源应答器监测作为一个独立系统的固定模式,对有源应答器监测与微机监测和有源应答器监测与列控系统进行集成的两个方案进行论述。 Active balise monitoring system has been used on CTCS-2 lines,but its further application on new lines is affected by its own weakness.Actually,it is necessary to monitor balises operation for reducing hidden troubles and ensuring safety of train operation.So the paper discusses two schemes of integrating the active balise monitoring system with signal computer monitoring system and train control system from the point of system integration.
作者 张广军
出处 《铁路通信信号工程技术》 2010年第5期5-8,共4页 Railway Signalling & Communication Engineering
关键词 有源应答器监测 微机监测 列控系统 系统集成 Active balise monitoring Signal computer monitoring Train control system and System integration
  • 相关文献

参考文献4

  • 1运基信号[2008]65号有源应答器监测装置技术条件(暂行)[S].
  • 2运基信号[2007]105号CTCS-2级列车运行控制系统维护管理规定(暂行)[S].
  • 3运基信号[2007]696号调度集中系统(CTC)数据通信规程(V1.0)[S].
  • 4运基信号[2006]517号信号微机监测系统技术条件(暂行)[S].

共引文献1

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部