摘要
对总承包工程中设备安装调试管理的重要性、前期工作、安装管理、单机调试管理、联动试车的管理和安装调试的后续工作等进行了系统地阐述。
The importance of equipment installation and testing management,preliminary work,installation management,single machine testing management,interlocking test run management and follow-up work after installation and testing in EPC project were described systematically.
出处
《工程建设》
2010年第5期54-56,59,共4页
Engineering Construction
关键词
设备安装
设备调试
总承包工程
equipment installation
equipment testing
EPC project