摘要
在发电厂测量发电机线圈温度时,对前置机安装调试中网络的匹配问题、地址设定问题、接线中的干扰抑制的分析与处理。
When measuring the generator coil temperature in power plant, make the analysis and treatment to network metch and address setting problems in the installation and commisioning of preposition machine, and interference suppression in wiring.
出处
《锅炉制造》
2010年第6期59-61,64,共4页
Boiler Manufacturing
关键词
前置机
电磁干扰
网络的匹配
pretage machine
electromagnetic interference
network match