摘要 合龙段置换加固技术是解决在役PC斜拉桥合龙段失效问题的新途径,而原合龙段的拆除后的全桥整体稳定性问题是不可忽视的,在合龙段拆除施工前必须进行分析并确认,以保证拆除施工的结构安全.应用结构稳定性原理,采用空间有限元分析,计算了天津永和大桥合龙段拆除前后的弹性屈曲安全系数,考虑结构几何和材料非线性,计算了全桥结构非线性稳定安全系数.非线性分析结果表明,合龙段拆除前,全桥结构具有较高的稳定性,其安全系数满足规范要求,而合龙段拆除后,全桥结构稳定安全系数有所降低,是一个比成桥更加危险的状态,采取有效措施对全桥整体稳定性予以加强是非常必要的. When the closure segment failed in an existing prestressed concrete cable stayed bridge,the technology of replacing the closure segment was a new and effective way for this.But the global stability of the structure after removal of the old closure segment could not be ignored and must be verified before construction to ensure the structural safety.Using the theory of structural stability and FEM,the elastic buckling safety factors of Yonghe Bridge in Tianjin before and after removal of its closure segment in the middle span were calculated.Then considering its geometrical and material nonlinearity,the global stability safety factor was calculated again.Calculation results showed that, before removing the old closure segment,the global stability safety factor was big enough to meet the requirements of current bridge codes,but the factor after removing the closure segment is somewhat smaller.From the global stability point of view,the structural state after removal of the closure segment was more dangerous than the state before removal of the closure segment,and some effective measures must be taken during construction to improve the global stability.
出处 《武汉理工大学学报(交通科学与工程版)》 2010年第5期869-873,共5页 Journal of Wuhan University of Technology(Transportation Science & Engineering)
基金 交通部西部交通建设科技项目资助(批准号:200731822340)
关键词 斜拉桥 稳定性 非线性分析 合龙段 拆除 cable stayed bridges stability nonlinear analysis closure segment removal
  • 相关文献

参考文献9

  • 1李宏江,李万恒,张劲泉,王江,张永明,王荣石.天津永和大桥的维修与加固[J].世界桥梁,2009,37(1):53-56. 被引量:18
  • 2胡隽,吴海林.PC斜拉桥的稳定性分析[J].工程力学,2000,2(A02):567-571. 被引量:1
  • 3李国豪.桥梁结构稳定与振动[M].北京:中国铁道出版社,2002.287-344.
  • 4周超舟,蔡登山,吕小武,马森.斜拉桥的稳定性分析[J].世界桥梁,2006,34(4):44-46. 被引量:6
  • 5Yang Y B, Tsay Jiunn-Yin. Geometric nonlinear analysis of cable structures with a two-node cable element by generalized displacement control method [J]. International Journal of Structural Stability and Dynamics, 2007, 7(4) :571-588.
  • 6Wang Ji, Zhang Mingzhong, Guo Xiaoli. Nonlinear stability analysis on the concrete casting step of long- span concrete-filled steel tube arch bridge[A]. 6th International Forum on Advanced Material Science and Technology, IFAMST 2008[C]. Hong Kong, China, 2009 : 275-282.
  • 7西南交通大学.重庆江津观音岩长江大桥主桥静力稳定性分析研究报告[R].成都:西南交通大学,2008.
  • 8中华人民共和国交通运输部.JTG/TD65-01-2007公路斜拉桥设计细则[S].北京:人民交通出版社,2007.
  • 9李宏江,李万恒,张劲泉,王江,王荣石.既有PC斜拉桥合龙段拆除的施工控制[J].公路交通科技,2008,25(8):61-66. 被引量:16

二级参考文献23

  • 1伏魁先,刘学信,黄华彪.斜拉桥面内整体失稳分析[J].铁道学报,1993,15(4):74-79. 被引量:12
  • 2朱正伟,刘东燕,彭文轩.体外预应力技术在桥梁加固中应用的思考[J].重庆建筑大学学报,2005,27(2):46-50. 被引量:33
  • 3檀兴华.斜拉桥索力监测技术研究与应用[J].公路,2006,51(3):146-154. 被引量:11
  • 4刘世同,许汉铮,陈晔.五河口斜拉桥合龙施工与控制技术[J].现代交通技术,2006,3(3):42-45. 被引量:9
  • 5丁皓江.弹性和塑性力学中的有限单元法[M].北京:机械工业出版社,1992.155-165.
  • 6李宏江,李万恒,张劲泉,等.天津永和大桥合龙段拆除前后全桥整体稳定性分析[C]//全国既有桥梁加固、改造与评价学术会议论文集.北京:人民交通出版社,2008:28-33.
  • 7蒋伟平.斜拉桥换索理论及其技术问题的研究(硕士学位论文)[D].成都:西南交通大学,2000.
  • 8刘永刚.犍为岷江大桥换索工程计算与分析(硕士学位论文)[D].成都:西南交通大学,2000.
  • 9[1]Man-Chung Tang.Stability of Cable-Stayed Bridges[A].Proceedings of Structural Stability[C].St.Louis,Missouri:American Civil Engineers Association Press Ltd.,1990.
  • 10[3]Podolny Walter,John B Scalzi.Construction and Design of Cable-Stayed Bridges[M].New York:Pittsburgh University Press (American) Ltd,1986.

共引文献164

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部