期刊文献+

火电厂建设项目实施过程后评价指标体系研究 被引量:9

Study on Indicator System for Post-Evaluation of Thermal Power Plant Construction Project
原文传递
导出
摘要 论述了过程后评价是根据项目的结果和作用从项目的实施过程中分析产生相应后果的原因和影响因素,对项目的管理决策、设计和开工准备、实施过程控制情况、竣工验收和生产准备等环节的总结评价。同时利用物元可拓模型对保定热电厂八期的扩建项目进行过程后评价,作为指标体系度量标准的考核。 Based on the results and roles of the project,the method of post-evaluation is to analyses the causes and influential factors of the consequences occurring during the implementation process,and evaluates the project management decision,the design and start preparation,the control of implementation process,the final acceptance and the operation preparation.This method was applied to the eighth expansion project in the Thermal Power Plant of Baoding,using matter-element and extension model,as standards of appraisal target system.
出处 《华东电力》 北大核心 2010年第9期1416-1420,共5页 East China Electric Power
基金 国家自然科学基金对外交流与合作项目(70810024)~~
关键词 火电建设项目 实施过程后评价 指标体系 物元可拓模型 thermal power construction projects the implementation process post-evaluation indicator system matter-element and extension model
  • 相关文献

参考文献6

二级参考文献29

共引文献42

同被引文献34

引证文献9

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部