摘要
对作为电能计量装置综合误差3个组成部分(电能表误差、互感器合成误差以及电压互感器二次回路压降引起的合成误差)之一的TV二次回路压降引起的误差进行分析,并提出了改造方案。
Being one of three constituents of the electric energy measurement equipment comprehensive errors(watt-hour meter error,transformer combined error and combined error caused by voltage drop of transformer voltage secondary circuit),the error caused by the voltage drop of TV secondary circuit was analyzed,and the modification scheme was proposed.
出处
《华东电力》
北大核心
2010年第9期1469-1471,共3页
East China Electric Power
关键词
电压互感器
二次回路压降
改造方案
voltage transformer
secondary circuit voltage drop
modification scheme