摘要
基于苏州轨道交通1号线星港街站-会展中心站2352m盾构区间的测量控制实例,分析了区间长度大于1500m的盾构区间的测量控制重点和难点,阐述了在实际作业中的测量控制方法及控制要点,对同类工程施工有重要的参考意义。
Based on the survey control example of the 2 352 m-long shield section from Xinggangjie Station to Exhibition Centre Station of Suzhou rail transit Line 1,survey control emphasis and difficulties of the shield sections longer than 1500 m are analyzed,and survey control method and keys in practical work are discussed in this article.It is a very important reference for similar projects.
出处
《铁道建筑技术》
2010年第10期53-55,61,共4页
Railway Construction Technology
关键词
轨道交通
盾构区间
控制测量
rail transit
shield section
control survey