尿素合成塔损伤及焊接修复技术 被引量:1

Damage Analysis for Urea Synthesis Converter and Repairing Technique
下载PDF
导出
摘要 某厂尿素合成塔经8万h运行后检查发现,奥氏体不锈钢衬里中下部存在明显均匀腐蚀,中上部焊缝区及部分母材、托架出现严重开裂。解决了修复中几个技术关键,包括对隐性敏态及非敏态裂纹的探伤、不锈钢衬里补焊过程中的脆性开裂、衬里贴合不紧密区裂纹的修复、确保衬里大面积堆焊区的抗腐蚀性能等,对损伤尿塔进行了修复,经几年运行考验,证明修复技术可靠。 The inspections showed that general corrosion was striking in middling-lower section of aus-tenite stainless steel lining of the urea synthesis converter,serious cracking exist on weld and local parent metal in middling-upper section of the tower working in 8 × 104 h.Damaged tower had been repaired successfully after solving technical keys(include detection of recessive sensitized cracks and non-sensi-tized cracks,brittle crackingr,epairing of loose-lining zone,ensure corrosion resistance for large repair zone).Its reliability was confirmed by years service.
出处 《压力容器》 北大核心 2010年第10期56-59,29,共5页 Pressure Vessel Technology
关键词 尿素合成塔 腐蚀及裂纹 修复 urea synthesis converter corrosion and cracking repairing
  • 相关文献

参考文献2

  • 1化工机械研究院,腐蚀与防护手册-化工生产装置的腐蚀与防护[M].北京:化学工业出版社,1991.10.
  • 2陈团海,陈国明,李伟.尿素合成塔缺陷评定[J].压力容器,2009,26(3):43-48. 被引量:4

二级参考文献9

共引文献8

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部