摘要 导流方案的设计比选是施工组织设计的重要部分,对施工安排、工程投资等均有较大影响。依托巴山水电站,介绍了其施工导流的选择标准;从施工条件、工程量、造价等方面比较了两个导流方案的优缺点;在确定的导流方案基础上,依据水力计算成果、工程量及可比投资方面,对四个导流隧洞方案进行了比较,确定了导流隧洞断面方案。 River diversion design scheme selection is an important part in construction organization design , which makes great influence on construction arrangement and project investment. According to practices in Bashan hydropower station , the selection of its construction diversion scheme is described. Advantages and disadvantages of two river diversion schemes are compared in aspects of construction conditions , amount of works and cost . For selected river diversion scheme , 4 diversion tunnel options are compared based on hydraulic computation results , amount of works and comparable investment so as to determine diversion tunnel cross section.
作者 邓勇
机构地区 重庆市电力公司
出处 《四川水力发电》 2010年第A02期264-266,共3页 Sichuan Hydropower
关键词 巴山水电站 施工导流 导流标准 导流方案 Bashan hydropower station river diversion during construction diversion standard river diversion scheme
  • 相关文献

参考文献1

  • 1SDJ338-89.水利水电工程施工组织设计规范[S].[S].,..

共引文献16

同被引文献4

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部