期刊文献+

斜拉桥190m主塔锚固区U形预应力管道摩阻试验研究 被引量:2

Experiment Research on Prestressed U-shaped Pipe Friction of 190 m Cable-stayed Bridge Main Tower Anchorage Zone
下载PDF
导出
摘要 针对斜拉桥190m主塔塔身锚固区U形预应力管道摩阻试验的过程,没有像传统的斜拉桥做此试验时制作足尺模型,而是直接利用塔身位置上的设计孔道,采用2台千斤顶对拉进行摩阻试验,并对整个过程进行了总结,形成科研成果。该方法简单、方便,既节省了成本,又能达到试验目的,可供同类桥梁施工借鉴。 In the friction test process of U-shaped pipe of 190 m cable-stayed bridge main tower anchorage zone,steel strands are entered into pore channel that lies in tower body,and stretched by two hoisting jacks,while the traditional full scale model is not maked.This paper summarizes the whole process and come into scientific research achievements.The method is simple,convenient and economical and could be taken as reference to similar bridges.
作者 卜东平
出处 《现代交通技术》 2010年第5期47-50,共4页 Modern Transportation Technology
关键词 斜拉桥 锚固区 摩阻试验 U形预应力管道 摩擦系数 足尺 cable-stayed bridge anchorage zone friction test U-shaped prestressed pipe friction coefficient full-scale
  • 相关文献

参考文献4

二级参考文献4

共引文献1734

同被引文献14

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部